防水涂料施工方法、工艺及技术措施。 |
添加时间:2021/2/20 14:34:12 浏览次数: |
防水涂料施工方法、工艺及技术措施。 Construction method, technology and technical measures of waterproof coating. 本工程地下室底板,地下室外墙防水层两道。采用2㎜厚聚氨脂防水涂料,卷材采用三元乙丙橡胶防水卷材1.5㎜厚。 There are two waterproofing layers for basement floor and basement exterior wall of this project. A 2-inch thick polyurethane waterproofing coating was used, and EPDM waterproofing membrane was 1.5 inch thick. 1. 地下防水工程的防水层,均应在地基及结构验收合格后施工。 1. The waterproofing layer of underground waterproofing engineering shall be constructed after the foundation and structure have passed the acceptance. 2. 地下室底板防水工程施工期间,地下水位应降至防水工程底部最低标高以下,不小于300㎜,直至防水工程全部完成为止。 2. During the construction of basement floor waterproofing project, the groundwater level should be reduced to below the lowest elevation of the bottom of the waterproofing project, not less than 300 feet, until the completion of the waterproofing project. 3. 聚氨脂防水涂料施工、工艺及方法 3. Construction, Technology and Method of Polyurethane Waterproof Coatings 防水涂料施工工艺 Construction Technology of Waterproof Coatings |
上一页 水泥基防水材料 |
下一页 施工技术要点 |
Copyright © 技术支持:遨游网络